A proposal for Chongming Island at the mouth of the Yangtze: instead of a dike that separates the village from the mangrove, a water infrastructure that stores, connects and mediates between settlement and wetland.
Matheus Rudo Oliveira · 2026-11-02

The proposal starts from a very specific place: Chongming, the island at the mouth of the Yangtze River, on the far eastern edge of Shanghai — China's largest river island and one of the last preserved tidal wetlands in the region. The project occupies a strip between three conditions that currently face each other: the consolidated rural village, the productive farmland and the mangrove.
The diagnosis
The board organises the reading of the site in four layers:
- Ecological island — East Asian monsoon climate, with protected tidal wetlands.
- Water landscape — canals, ditches, fields and streams that already carry water from the interior to the tide.
- Rural edge — the existing village, with a population of more than six thousand people and farmland in use.
- Transition to the wetland — the strip where the settlement meets the mangrove.
The thesis
The central idea is to refuse the dike as a barrier. Instead of separating the village from the water, the water infrastructure is reorganised to work as a living system: “not a barrier, but a living system”. The island's water stops being a risk to contain and becomes the material that structures public space, production and habitat.
Three strategies
Store. Rainwater is collected and kept in reservoirs and reorganised wetland systems, for flood control, reuse and the ecological health of the whole.
Connect. A continuous path stitches the existing village, the new residential areas, the farmland and the wetland into a network of public spaces. Pedestrian movement is what turns separate parts into a single place.
Transition. A layered landscape — settlement, productive field and restored wetland — builds the gradual passage from village to mangrove. It is this gradation that names the project: the living dike.
Six moves
The board unfolds the strategy into six interventions: water storage, public path, community spaces, energy and services, productive edge and constructed wetland. Each solves one stretch of the profile between the village and the water, and together they form the continuous section that crosses the transition strip.
Reading
The project has a conceptual economy that is rare in coastal resilience proposals: it adds no new barrier, it uses the water network that already exists and changes its function. Flood defence becomes an effect of how the territory is inhabited, rather than of a wall between it and the sea.